1. Hauptnavigation
  2. Navigation des Hauptbereiches
  3. Inhalt der Seite

TFR pilot plant

Wastewater test plant - TFR pilotClick to enlarge image

DAS provides completely pre-mounted, transportable pilot plants for requirement tests directly installed at the customer’s location. 

The flexible and small footprint pilot plants determine, on-site, the exact parameters for large-scale systems when ultimately installed. In this way, we ensure that individual DAS solution precisely fits each customer’s specific needs.


 

Your Benefits

  • Easy transport, mounting and installation at customers site
  • Small-sized footprint
  • Optimal dimensioning of fullscale plant
  • Optimization prior to investment
  • Verification of performance prior to investment in fullscale plant

 

Field of Application

  • Dimensioning and design
  • Demonstration of technology
  • Verification of performance
  • Evaluation of operating costs
  • Preliminary researches for treatment of hardly degradable waste water
  • Tests for extension of existing plants
Pilot plant - TFR pilot: Target: 5000 mg/l COD. Wastewater treatment for automobile industry, lumber industry and washing plants in a time period of two months.Click to enlarge image
Pilot plant - TFR pilot: Target: 5000 mg/l COD. Wastewater treatment for automobile industry, lumber industry and washing plants in a time period of two months.